[SMM News] Li Bin, the train owner killed on the guardrail of EC6 Tackle, replied: very sad

Published: Jul 30, 2021 20:23

On July 30, an online video showed that a Lulai EC6 electric car crashed and burst into flames in Pudong, Shanghai, killing its owner.

Li Bin said that a team was organized to help clean up the aftermath and the investigation of the accident, according to a notice issued by the official of Xilai on its App. The exact cause of the accident is still under investigation.

Li Bin, founder and CEO of Xilai, replied under the notice: "I was very sad to hear the news this morning. I mourn the unfortunate death of the user who has organized a team to help with the aftermath and accident investigation."

At present, the fire department determined that it was a traffic accident, while the traffic police department is still investigating the traffic accident.

Xia Qinghua, general manager of Shanghai Lulai Automobile customer Service Co., Ltd., also expressed condolences to the driver, saying that he would do a good job in dealing with the aftermath and cooperate in analyzing the cause of the accident, and the follow-up information of Synchronize would be informed in time.

Xia Qinghua also said that according to the preliminary judgment of the damaged vehicle, the battery pack is basically intact.

It is understood that the EC6 is an intelligent electric sedan SUV, under the Lulai brand, which began to be delivered in September last year. At present, it is not clear what kind of configuration the accident vehicle is.

As soon as it happened, it fermented on the Internet, causing a heated discussion among netizens.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
14 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
14 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
14 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
14 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
14 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
14 hours ago